Epping North High-Level Ceiling Void Remediation

Epping North High-Level Ceiling Void Remediation

Epping North, Essex

Mould remediation case study in Epping North

Property Type:

Residential property

Property Type:

Residential property

Service:

Specialist mould remediation

Service:

Specialist mould remediation

Duration:

Specialist remediation project

Duration:

Specialist remediation project

Guarantee:

Condition 1 verification

Guarantee:

Condition 1 verification

Project overview

Specialist mould remediation following a roof leak affecting a high-level ceiling void.

Due to the height of the work area, a bespoke containment enclosure was constructed on scaffolding to provide safe access while preventing the spread of mould contamination to the occupied parts of the property.

Scaffold tower and containment in a stairwell for high-level ceiling void remediation in Epping
Stairwell with containment sheeting and scaffold access for ceiling void works
Sealed corridor with containment and protective floor covering
Containment along a corridor with protected flooring in Epping
Scaffold tower inside containment sheeting for high-level access
Looking up a scaffold tower inside full-height containment
Floor-to-ceiling containment sheeting sealing a high-level work area
Scaffold and safety signage at the entrance to a containment area in Epping
Scaffold tower inside containment reaching a high-level ceiling void

Our approach

A scaffolded containment enclosure was built around the high-level ceiling void, allowing the team to work safely while keeping the affected area isolated from occupied parts of the property.

HEPA air filtration was used throughout the project, allowing contaminated materials to be removed under controlled conditions.

What we did

Contaminated materials were removed from the high-level work area while containment and filtration protected the rest of the property.

Exposed structural timbers were professionally remediated before the area received a detailed HEPA clean.

Post-remediation surface swab testing was then carried out to verify the condition of the remediated area.

The result

The works were successfully completed with the area returned to Condition 1, Normal Fungal Ecology, in accordance with the principles of the IICRC S520 Standard.

The completed project provided safe high-level remediation, controlled contamination risk and verified post-remediation results.